| 24-3351-INV | Investigation into the potential need for transmission system improvements identified in the 2024 Vermont Long-Range Transmission Plan | Open | Case Age: 626 | ||
| Regulatory / Investigation: Open | Date filed: 11/4/24 | Hearing Officer | |||
| Electric | |||||
Summary-Portal
|
Caption: Investigation into the potential need for transmission system improvements identified in the 2024 Vermont Long-Range Transmission Plan
|